College Protestant Francais New generator room
Nakhoul Corporation s.a.r.l. is working on the supply and Installation of stainless steel flue pipes for the generator room at CPF- KORAYTEM.
Four stainless steel flue pipes vertical/horizontal connected to 4 generators (3×500 kVA and 1×200 kVA each).